2. The backup power unit (UPS) locked up at our Rainbow Lake site around 11 pm on Friday. Unit was reset and system access was restored.
It should be noted that some sites we do not have 24 hour access and unless the site owner contacted us to fix the problem , we have to wait till daybreak to access the site.
| permalink | related link
Just a reminder that our service levels/ price are as follows:
BROADBAND PRICE SPEED
Basic $28.95 *up to 500k
Advanced $38.95 *1Mbps/500kbps
Power User $48.95 *1Mbps QOS, Min. CIR
If you want to drop down to the $28.95 rate just call the office or email support00@mutualdata.com and the change can be made.
*all speeds are up to and are not guaranteed; speeds listed are download by upload; if you work from home and have high packet or high bandwidth needs, the higher rate may be required ($48.95 versus $38.95). Trees and obstructions do affect your throughput.
| permalink | related link
Since April 2008 our spam filtering has handled the following email:
Total Day Hour
Blocked 17,715,849 56,007 4,949
Blocked: Virus 506 1 0
Rate Controlled 2,906,668 16,181 1,943
Quarantined 101,193 246 40
Allowed: Tagged 0 0 0
Allowed 461,856 1,150 258
Total Received 21,186,072 73,585 7,190
Which works out to be delivering only 2% of mail as valid ( allowed/total)
98% was junk or had to be quarantined for some reason.
| permalink | related link
We had two power outages today
First a dump truck pulled the wires down at the Gilson road and Colony road tower location.
Second, a Fedex truck caught some Verizon wires and pulled off the power and wiring on our downtown location.
Both have been repaired.
| permalink | related link
Most of St. Johns was without power Friday night as Consumers Energy did repair work on the power station. As of this morning all systems are reporting back online.
| permalink | related link